Sunday, April 4, 2021

April 2019 Stitch of the Month

                                                   April 2019 Stitch of the Month



     Moss Stitch 

This stitch is worked on a multiple of 2 stitches. 



For base, chain 26 stitches Starting row: 

Sk 1 ch, *sc in next ch, dc in next ch, repeat from * across row, ch 1, turn.

All Rows: 

*sc in dc, dc in sc, repeat from * across row,

 ch 1, turn.

Repeat until it's the size you want, or until square.

         

Summer night gown

  Summer night gown, long to the floor and mid length sleeves for chilly summer nights. I have sewn roses on the top and the skirt. All fabr...