Thursday, July 1, 2021

July 2019 Stitch of the Month Knit

 

July 2019 Stitch of the Month Knit


 

Eyelet Stitch Waves

 

 

Note: S2Kp2, slip 2 stitches as one, knitwise, K the next stitch, pass 2 slipped over the stitch just knitted.

 Multiples of 7 + 4

 Cast on 25. ( 3 x 7 = 21 + 4 = 25)

 Row 1: knit (wrong side)

 Row 2: knit

 Row 3: purl

 Row 4: *k 4, yo, S2Kp2, yo, repeat from *, end k 4.

Repeat rows 1 to 4 for desired length, repeat rows 1 and 2 once, bind off.

 

Thursday, June 3, 2021

June 2019 Stitch of the Month Crochet

 

June 2019 Stitch of the Month Crochet


Open Treble Bobble Stitch 2




Notes: Treble Bobble Stitch ( TBS ): work 1 T (yo 2x) until you have 2 loops left on hook, work 4 more T's until you have 6 loops left on hook, yo, draw through all loops on hook, 1 loop left.

Uneven amount of stitches

 For sample ch 27

 Row 1: work TBS in 4th ch from hook, * ch 2, sk 3 work TBS in next ch, repeat from * across row, ch 4 turn.

 Row 2: skip frist TBS, * work TBS in ch 2 sp, ch 2, repeat from * across row, end 1 TB in top of turning chain, ch 4, turn.

 Repeat row 2 for desired length.

 

 

Sunday, May 16, 2021

Pink Ski Hat #2

Pink Ski Hat #2 
 @2013 By N. Banks
Another one for Charity. Please let me know if you like these hats. thanks



Materials:
6 oz. of Pink, plus a couple of oz each  White, Purple and a Variegated purple in worsted weight.  I used Pink as my main color.
Size 5 & 7 circular knitting needles, size 7 double pointed needles
1 row counter, 10 stitch markers, yarn needle
With pink and using size 5 circular needle, cast on 96 being careful not to twist the stitches.
Rds 1 to 7: knit 2, purl 2
Change to size 7 circular needle, and start round 8 of chart, attach and fasten off colors as needed, do not fasten off pink.
Top of Hat:
Rd 36: inc to 100, knit place marker after every 10th stitch.
Rd 37: Knit 

Rd 38: purl

Rd: 39 knit to 3 stitches before marker, k 2 tog, k 1.
Rd 40: knit
Repeat round 39 and 40 until you have 20 stitches left, change to double pointed needles when needed.
Next round: k 2 tog. , around.  Cut yarn leaving a long tail, run yarn needle though remaining stitches,  run needle though again, and pull up tight,  work ends of yarn in.

Blank Squares = Pink     White = W    Purple= PU    Variegated = V


PU
PU
PU
PU
PU
PU
35
PU
PU
PU
PU
PU
PU
34
PU
PU
PU
PU
PU
PU
33
32
W
W
W
W
W
W
W
W
W
W
W
W
31
W
W
W
W
W
W
W
W
W
W
W
W
30
29
V
V
V
V
V
V
V
V
V
V
V
V
 28
V
V
V
V
27
V
V
V
V
26
V
V
V
V
V
V
V
V
25
V
V
V
V
V
V
24
23
V
V
V
V
V
V
V
V
V
V
V
V
22
 21
V
V
V
V
V
V
20
V
V
V
V
V
V
V
V
19
V
V
V
V
18
V
V
V
V
17
V
V
V
V
V
V
V
V
V
V
V
V
16
15
W
W
W
W
W
W
W
W
W
W
W
W
 14
W
W
W
W
W
W
W
W
W
W
W
W
13
12
PU
PU
PU
PU
PU
PU
11
PU
PU
PU
PU
PU
PU
10
PU
PU
PU
PU
PU
PU
9
12
11
10
9
8
7
6
5
4
3
2
1
8

This pattern is copyrighted, and may not be used on any media, including websites,  lists, newsletters, nor sold or recopied.  It is for your personal use only.




September 2024 Stitch of the Month Crochet

  September 2024 Stitch of the Month Crochet     Grit Stitch   multiples of 2 +1 For sample chain 21 ( 2 x 10 = 20 + 1 = 21 ) Row ...