Thursday, November 11, 2021

Yellow Ski Hat


Yellow Ski Hat @2013 by N. Banks

Another one for the Hat Charity in Maine, hope you like it.

Materials:                 Main:  yellow
Secondary colors:   Purple, Brown an d Blue in worsted weight yarns. I use Red Heart.
Size 5 & 7 circular knitting needles, size 7 double pointed needles
1 row counter, and 10 stitch markers
With yellow and size 5 needles, cast on 100.
Rds 1 to 7: Knit 2, Purl 2 around.  
With size 7 needle, start row 1 of chart, working from right to left. Be sure and twist yarns at the beginning of each round, fasten off colors when needed.

Y = Yellow  P = Purple   Br =Brown    Bl = Blue

P
P
P
P
P
P
P
P
P
P
27
BL
Y
BL
Y
BL
Y
BL
Y
BL
Y
26
P
P
P
P
P
P
P
P
P
P
25
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
24
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
23
BL
BL
BL
BL
BL
BL
BL
BL
BL
BL
22
BL
BL
BL
BL
BL
BL
BL
BL
BL
BL
21
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
20
BL
BR
BL
BR
BL
BR
BL
BR
BL
BR
19
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
18
BL
Y
BL
Y
BL
Y
BL
Y
BL
Y
17
BL
Y
BL
Y
BL
Y
BL
Y
BL
Y
16
BL
Y
BL
Y
BL
Y
BL
Y
BL
Y
15
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
14
BL
Y
BL
Y
BL
Y
BL
Y
BL
Y
13
BL
Y
BL
Y
BL
Y
BL
Y
BL
Y
12
BL
Y
BL
Y
BL
Y
BL
Y
BL
Y
11
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
10
BL
BR
BL
BR
BL
BR
BL
BR
BL
BR
9
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8
BL
BL
BL
BL
BL
BL
BL
BL
BL
BL
7
BL
BL
BL
BL
BL
BL
BL
BL
BL
BL
6
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
5
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
4
P
P
P
P
P
P
P
P
P
P
3
BL
Y
BL
Y
BL
Y
BL
Y
BL
Y
2
P
P
P
P
P
P
P
P
P
P
1
10
9
8
7
6
5
4
3
2
1

After working chart, complete hat as follows:
Top or crown of hat:
Rd 28 & 29: fasten off the blue and purple, with yellow knit.
Rd 30:  purl  and place markers after every 10th stitch,
Rd 31:  Knit to 2 stitches before marker, knit 2 tog.
Rd 32:  knit  
Repeat rounds 31 and 32 until you have 10 stitches left,  change to double pointed needles when needed.  Cut yarn leaving a long tail, run yarn though remaining stitches and pull up tight, work ends of yarn in.

This pattern is copyrighted, and may not be used on any media, including websites, lists, newsletters, nor sold or recopied.  It is for your personal use only.


Monday, November 1, 2021

November 2019 Stitch of the Month Knit

 

November 2019 Stitch of the Month Knit 

The Little Crown Stitch

 

 

Multiples of 3 + 2

Note:  k1, p1, k1 in the same 3 stitch loops. First, using the 3 loops as one stitch, knit the stitch,  do not remove the 3 loops from the left hand needle, you will have a knit stitch on the right hand needle, then bring yarn to front under right hand needle, and purl the loops on the left hand needle,do not remove the 3 loops  from the left hand needle, now you will have a purl stitch on the right hand needle, then bring the yarn to the back under the right hand needle and knit the 3 loops. Now you have another knit stitch on the right hand needle. All 3 loops are now on the right hand needle.

Cast on 20 ( 3 x 6 = 18 + 2 = 20)

Row 1: Knit   (side right)

Row 2: Knit 

Row 3: K1, *k1 while wrapping yarn twice; rep from * till last st, k1

Row 4: K1, *sl next 3 sts (these are the wrapping yarn twice from row 3) and let the second loop drop, ( see picture A ) place slipped sts back on the left hand needle, (see picture B ) using the 3 loops as one stitch [k1, p1, k1] all into the same 3 loop stitch; rep from * to last st, k1. When done with this row, you should have the 20 stitches you started with.

 

Picture A.                                                                           

   


    



 Picture B
         





Repeat rows 1 – 4 until desired length, then knit rows 1 and 2 once, bind off in purl. 

Monday, October 18, 2021

October 2019 Pattern of the Month Ear Muffs or Head Band

 

October 2019 Pattern of the Month

Ear Muffs or Head Band@2017 by N Banks

 

Materials:

G Hook

4 ply worsted weight yarn in a variegated color

chain 16

Set up row: 1 sc in second chain from hook and in each chain across row.

Row 1: 3 ch, * 00 yoh, insert hook in next sc, yoh, draw through loop, yoh, draw through 2 loops 00, repeat from 00 to 00 3 times, yoh, draw through 4 loops, 1 ch, skip 1 next sc *.  Repeat from * across row. Finish row with 1 dc in top of turning chain.

 Row 2: 1 ch, * 1 sc in space, 1 sc in top of motif *, end 1 sc in top of turning chain, turn.

Repeat rows 1 and 2 for a total of 24 times. Do not fasten off, holding ends together, slip stitch across row, do not fasten off. Turn inside out.

* ch 3, 3 dc in same place, sc in next end stitch of the sc row. Repeat from * around. Join.  Fasten off, attach yarn to the other side and repeat from * around.Join. Fasten off, weave in the yarn ends.

This pattern is copyrighted, and may not be used on any media, including websites, lists, newsletters, nor sold, recopied or reformatted without permission. It is for your personal use only.

 

Dust cover for my sewing machine

 I needed  a new dust cover for my old kenmore sewing machine, I have had this machine since the 1960's, still works good