Tuesday, November 17, 2015

Lavender Waves Scarf Cowl January 2013 Pattern

January 2013 Pattern of the Month Knit

Lavender Waves Scarf Cowl
 
Size 8 circular knitting needles 29 inches
1 ball baby sport weight yarn, 5 oz, 446 yards
24 stitch markers.

Notes: Slip markers as you come to them.

Stitches used      Knit, purl.
 
Cast on 182 stitches, join being careful not to twist the stitches.

Set up row:

Rd 1: *K 11, place marker, k 3, place marker,  repeat from * around. 

Rd 2: purl

Rd 3: knit

Rd 4: purl

Rd 5: knit

Rd 6: * k 2 tog, twice, (yo, k 1) 3 times, yo, SSK, SSK, k 1, p 1, k 1 repeat from * around.

Rd 7: *k 11, p 1, k 1, p 1, repeat from * around.

Rd 8: k12, * p 1, k 13 repeat from * around

Rd 9: *k 11, p 1, k 1, p 1, repeat from * around.

Rd 10: *p 11, k 1, p 1, k 1, repeat from * around.

Rd 11: * k 2 tog, twice, (yo, k 1) 3 times, yo, SSK, SSK, p 1, k 1, p 1,  repeat from * around.

Rd 12: k12, * p 1, k 13 repeat from * around

Rd 13: k11, * p 1,k 1, p 1, repeat from * around

Rd 14: k 12, * p 1, k 13 repeat from * around.

Rd 15: p 12, *k 1, p 13, repeat from * around.

Repeat rows 6 to 15   Until 15 inches or to go up from the neck and over the head, then work rows 1 to 5 once, bind off, weave in the ends.

This pattern is copyrighted, and may not be used on any media, including websites, lists, newsletters, nor sold, recopied or reformatted. It is for your personal use only.

 

Wednesday, November 4, 2015

REFLECTIONS

REFLECTIONS@1991 by Nina Banks

Reflections of times past,
Playing easy on the mind,
Carry me back,
To sweet memories and you.
Held forever, locked by heart,
In the spring of my life.

Reflections of the heart,
Bring cherished thoughts,
And hours,
Spent dreaming of you,
Slowly burning embers in my mind,
In the summer of my life.

Reflections of the mind,
Awakening images, ever drifting.
Haunting melodies playing,
Beneath a thousand stars,
Aglow in the night,
In the fall of my life.

Reflections of many a long night,
I lost to a memory that
Carries me back to
Reflections of past times
And you.
In the winter of my life.

Thursday, October 29, 2015

December 2013 Stitch of the Month Crochet



December 2013 Stitch of the Month Crochet

Multiples of 5 + 2, (add 2 for base chain)

For sample chain 14, ( 5+2+2= 14)       

Row 1:  (right side): Skip 3 ch (count as 1 dc), 1 dc into next ch, *3 ch, skip 3
ch, 1 dc into each of next 2 ch; rep from * to end, turn.

Row 2: 3 ch (count as 1 dc), skip first st, * 5 dc into 2nd ch of next 3 chs
rep from * ending 1 dc into top of turning ch, turn.

Row 3: 3 ch (count as 1 dc), skip first st, 1 dc into next dc, * 3 ch, skip 3 dc, 1 dc
into each of next 2 dc; rep from * to end, turn.


Repeat rows 2 and 3 until desired length.  

 

Thursday, October 22, 2015

October 2013 Stitch of the Month Crochet


At My House

October 2013 Stitch of the Month Crochet

 Multiple of 9 ch sts plus 3


For sample chain 30 (9x3+3= 30)

 
Row 1: right side–Work 1 dc in 4th ch from hook, * skip next 2 ch, work 2 dc, ch 2, 2 dc–all in next ch for shell, skip 2 ch, 1 dc in each of next 4 ch; repeat from * twice more, skip next 2 ch, 1 shell in next ch, skip next 2 ch, 1 dc in each of last 2 ch.

Row 2: Ch 3, turn, 1 dc in 2nd dc, * 1 shell in next ch-2 space, 1 dc in each of next 4 dc; repeat from * twice more, 1 shell in next ch-2 space, 1 dc in next dc, 1 dc in top of turning ch.

Repeat row 2 until desired length, fasten off.

 

Saturday, October 17, 2015

Feather Stitch 2 November 2013 Stitch of the Month


At My House

November 2013 Stitch of the Month Knit

Feather Stitch 2 

Multiples of  7 + 2

Row 1: Knit to end of row.

Row 2: Purl to end of row.

Row 3:    k2. *yo, p1, p3 tog. P1, yo, k2. Repeat from * to end of row.

Row 4:  Purl to end of row.

Repeat rows 1 to 4 for pattern until desired length.

 

 

 

 

Monday, September 21, 2015

Popcorn can cover

This is a foot strool I made, no pattern just measured the popcorn can and made it to fit. First the top, and I made two covers for it, one for the can, then one for the bottom of the pillow, and then the top of the pillow. Made the piping out of the same material I used for the can base, turned out pretty I think.




Thursday, September 17, 2015

May 2013 Stitch of the Month Knit


May 2013 Stitch of the Month Knit

 

 Multiple of 13 sts
 

 

For sample cast on 39 (13x3= 39)
Rows 1 and 3-wrong side-K 2, * p 4, k 1, p 4, k 4; repeat from *, end last repeat k 2.
Row 2-P 2, * yo, SKP, k 2, p 1, k 2, k 2 tog., yo, p 4; repeat from *, end last repeat p 2.
Row 4-P 2, * k 1, yo, SKP, k 1, p 1, k 1, k 2 tog., yo, k 1, p 4; repeat from *, end last repeat p 2.
Rows 5 and 7-P 6, * k 1, p 12; repeat from *, end last repeat p 6.
Row 6-K 4, * yo, SKP, p 1, k 2 tog., yo, k 8; repeat from *, end last repeat k 4.
Row 8-K 5, * yo, sl 1, k 2 tog., pass sl st over the k 2 tog., yo, k 10; repeat from *, end last repeat k 5.
Repeat rows 1 to 8 until desired length, bind off after in pattern after row 8.


 
 


 
 

 

 

On the Blog

  On the Blog    April 2020 Pattern of the Month Crochet  BREAD TRAY DOILY April 2020 Pattern of the Month Crochet April 2020 Pattern of the...